Pod Point · EV charging site
Pod Point Tesco Superstore - Gainsborough
Trinity St, Gainsborough, DN21 2HA
Pod Point Tesco Superstore - Gainsborough is an EV charging site in Gainsborough, Lincolnshire, run by Pod Point. Its 5 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and published prices run from £0.44 to £0.62 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 100% uptime and recorded 313 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Dransfield Retail Park (InstaVolt Ltd), 0.1 miles away.
Status
3 of 5 available
Checking status…
Connectors
CCS or CHAdeMO · 50 kW
Type 2 · 22 kW
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Pod Point
- Opening hours
- Not published
- Payment
- Contactless card at the chargerIn the Pod Point app
- Charger ID
- Hugh-Pria
- Getting there
- EV charging is only permitted during the car parks specified opening hours, parking charges may apply, please check for signage at the store.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | 62.4p per kWh |
| CHAdeMO | 50 kW | 62.4p per kWh |
| Type 2 | 22 kW | 49.2p per kWh |
| Type 2 | 7 kW | 44.4p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pod Point Tesco Superstore - Gainsborough?
The listed price is Type 2 £0.44/kWh · Type 2 £0.49/kWh · CCS £0.62/kWh · CHAdeMO £0.62/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Pod Point Tesco Superstore - Gainsborough?
Up to 50 kW DC via Type 2, CCS, CHAdeMO.
How many charging sockets does Pod Point Tesco Superstore - Gainsborough have?
5 charging sockets: 2 × 7 kW Type 2, 2 × 22 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.
When is Pod Point Tesco Superstore - Gainsborough busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 9 pm. The live status on this page shows what is free before you set off.
How reliable is Pod Point Tesco Superstore - Gainsborough?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 313 observed charging sessions.
Who operates Pod Point Tesco Superstore - Gainsborough?
Pod Point Tesco Superstore - Gainsborough is on the Pod Point network.
Where is the nearest other charger with 50 kW or more to Pod Point Tesco Superstore - Gainsborough?
Dransfield Retail Park (InstaVolt Ltd) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pod Point Tesco Superstore - Gainsborough?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Tesco Superstore - Gainsborough?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Tesco Superstore - Gainsborough?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Dransfield Retail Park
- Roseway Car Park
- MFG Jet Bridge
- BNP Gainsborough
- Lincolnshire Otter, Gainsborough
- Lincolnshire Co-op Morton Food Store
- Fastest nearby
- BNP Gainsborough · 150 kW · 0.8 mi