# Pod Point Wheatland Farm

Web page: https://ampmap.co.uk/charger/pod-point-wheatland-farm-2-uk

Pod Point Wheatland Farm is an EV charging site in Winkleigh, Devon, run by Pod Point. It has a single 7 kW Type 2 socket, and the published price is £0.46 per kWh. Recorded live status shows it is usually busiest around 6 am, and Amp Map measured 100% uptime and recorded 22 charging sessions here over the last 30 days.

## Status

Full at 22 Nov 2026, 18:01 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Wheatland Farm, EX19 8DJ
- **Area:** Winkleigh, Devon, United Kingdom
- **Coordinates (latitude, longitude):** 50.87378, -3.92531

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | £0.46/kWh | 1 in use |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Pod Point
- **Opening hours:** Not published
- **Payment:** In the Pod Point app

## Common questions

### How much does it cost to charge at Pod Point Wheatland Farm?

The listed price is £0.46/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Pod Point Wheatland Farm?

Up to 7 kW AC via Type 2.

### How many charging sockets does Pod Point Wheatland Farm have?

1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.

### When is Pod Point Wheatland Farm busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 6 am and quietest around 3 pm. The live status on this page shows what is free before you set off.

### How reliable is Pod Point Wheatland Farm?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 22 observed charging sessions.

### Who operates Pod Point Wheatland Farm?

Pod Point Wheatland Farm is on the Pod Point network.

### How long does a Tesla Model Y Long Range take to charge at Pod Point Wheatland Farm?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Wheatland Farm?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Pod Point Wheatland Farm?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Winkleigh](https://ampmap.co.uk/chargers/united-kingdom/devon/winkleigh)
- [Pod Point chargers](https://ampmap.co.uk/networks/pod-point)

## Chargers near this site

- [Chulmleigh Playing Fields Association · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-chulmleigh-playing-fields-association-uk) - Type 2 7 kW · Leigh Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/pod-point-wheatland-farm-2-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Pod Point (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
