POGO · EV charging site
Campfield Square, Broughty Ferry
Campfield Square, Dundee, DD5 2PU
Campfield Square, Broughty Ferry is an EV charging site in Dundee, Dundee City, run by POGO. All 4 of its sockets are 200 kW CCS, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 100% uptime and recorded 227 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Best Western Woodlands (POGO), 0.2 miles away.
Status
4 of 4 available
Checking status…
Connectors
CCS · 200 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- POGO
- Opening hours
- Not published
- Payment
- In the PoGo Charge appRFID card
- Charger ID
- PoGo20227
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
65p per kWh
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Campfield Square, Broughty Ferry (POGO)?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Campfield Square, Broughty Ferry (POGO)?
Up to 200 kW DC via CCS.
How many charging sockets does Campfield Square, Broughty Ferry (POGO) have?
4 charging sockets: 4 × 200 kW CCS. Live per-socket availability is shown on this page.
When is Campfield Square, Broughty Ferry (POGO) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Campfield Square, Broughty Ferry (POGO)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 227 observed charging sessions.
Who operates Campfield Square, Broughty Ferry?
Campfield Square, Broughty Ferry is on the POGO network.
Where is the nearest other charger with 50 kW or more to Campfield Square, Broughty Ferry (POGO)?
Best Western Woodlands (POGO) is 0.2 miles away in a straight line, with up to 100 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Campfield Square, Broughty Ferry (POGO)?
A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Campfield Square, Broughty Ferry (POGO)?
A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Campfield Square, Broughty Ferry (POGO)?
A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Best Western Woodlands
- Michelin Scotland Innovation Park
- Michelin Tyres Dundee
- Pod Point Tesco Superstore - Dundee Monifieth
- Marine Drive, Monifieth
- Whitfield Centre
- Cheapest nearby
- Pod Point Tesco Superstore - Dundee Monifieth · 44.4p per kWh · 7 kW · 1.6 mi