Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

POGO · EV charging site

Cartgate Lodge

Cartgate Lodge A303, Yeovil, TA14 6RA

Cartgate Lodge is an EV charging site in Yeovil, Somerset, run by POGO. Its 5 sockets reach up to 80 kW, with CCS at the top speed, and the published price is £0.56 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 92% uptime and recorded 524 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Bell Inn (Yeovil) (evyve), 4 miles away.

Status

4 of 5 available

Checking status…

VerifiedLive status and details from POGO’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

CCS · 80 kW2 connectors · 56p per kWh2 free
SEC5204097% reliabilityAvailable
SEC5204097% reliabilityAvailable
CCS · 50 kW1 connector · 56p per kWhOut of service
SEC5035578% reliabilityOut of order
CHAdeMO · 50 kW1 connector · 56p per kWh1 free
SEC5035578% reliabilityAvailable
Type 2 · 22 kW1 connector · 56p per kWh1 free
SEC5035578% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
POGO
Opening hours
Not published
Payment
In the PoGo Charge appRFID card
Charger ID
SEC50355

Facilities

Hotel / inn

Always check directly with the charge point operator for the most up-to-date information.

Prices

56p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 80 kW CCS~44 min · ≈ 55 kWh · ~£31
Tesla Model 3 Rear-Wheel Drive 10–80% · 80 kW CCS~33 min · ≈ 40 kWh · ~£22
Audi Q4 e-tron 50 10–80% · 80 kW CCS~47 min · ≈ 51 kWh · ~£29
Hyundai IONIQ 5 10–80% · 80 kW CCS~40 min · ≈ 51 kWh · ~£28
MG Motor MG4 Trophy 10–80% · 80 kW CCS~38 min · ≈ 43 kWh · ~£24
Hyundai Kona Electric Long Range 10–80% · 80 kW CCS~42 min · ≈ 41 kWh · ~£23
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£16

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Cartgate Lodge (POGO)?

The listed price is £0.56/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Cartgate Lodge (POGO)?

Up to 80 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Cartgate Lodge (POGO) have?

5 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 2 × 80 kW CCS. Live per-socket availability is shown on this page.

When is Cartgate Lodge (POGO) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Cartgate Lodge (POGO)?

Amp Map measured 92% uptime here from recorded live status over the last 30 days, across 524 observed charging sessions.

Who operates Cartgate Lodge?

Cartgate Lodge is on the POGO network.

Where is the nearest other charger with 50 kW or more to Cartgate Lodge (POGO)?

Bell Inn (Yeovil) (evyve) is 4 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Cartgate Lodge (POGO)?

A typical 10–80% rapid charge takes about 44 min on the 80 kW CCS here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cartgate Lodge (POGO)?

A typical 10–80% rapid charge takes about 33 min on the 80 kW CCS here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Cartgate Lodge (POGO)?

A typical 10–80% rapid charge takes about 47 min on the 80 kW CCS here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: POGO · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.