Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

POGO · EV charging site

Chudleigh Library Car Park

Chudleigh Library Car Park, Newton Abbot, TQ13 0HL

Chudleigh Library Car Park is an EV charging site in Newton Abbot, Devon, run by POGO. Its 3 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the published price is £0.56 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 98% uptime and recorded 108 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Exeter Racecourse (Roam Charging), 3.1 miles away.

Status

1 of 3 available

Checking status…

VerifiedLive status and details from POGO’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 50 kW1 connector · 56p per kWh1 in use
SEC5008693% reliabilityCharging
CHAdeMO · 50 kW1 connector · 56p per kWhOut of service
SEC5008693% reliabilityOut of order
Type 2 · 22 kW1 connector · 56p per kWh1 free
SEC5008693% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
POGO
Opening hours
Not published
Payment
In the PoGo Charge appRFID card
Charger ID
SEC50086

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

56p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£31
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£22
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£29
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£28
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£24
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£23
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£16

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Chudleigh Library Car Park (POGO)?

The listed price is £0.56/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Chudleigh Library Car Park (POGO)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Chudleigh Library Car Park (POGO) have?

3 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2. Live per-socket availability is shown on this page.

When is Chudleigh Library Car Park (POGO) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 pm. The live status on this page shows what is free before you set off.

How reliable is Chudleigh Library Car Park (POGO)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 108 observed charging sessions.

Who operates Chudleigh Library Car Park?

Chudleigh Library Car Park is on the POGO network.

Where is the nearest other charger with 50 kW or more to Chudleigh Library Car Park (POGO)?

Exeter Racecourse (Roam Charging) is 3.1 miles away in a straight line, with up to 100 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Chudleigh Library Car Park (POGO)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Chudleigh Library Car Park (POGO)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Chudleigh Library Car Park (POGO)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: POGO · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.