Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

POGO · EV charging site

Holiday Inn Lincoln

Holiday Inn Lincoln, LN1 1YW

Holiday Inn Lincoln is an EV charging site in Lincoln, Lincolnshire, run by POGO. Its 6 sockets reach up to 100 kW, with CCS at the top speed, and the published price is £0.56 per kWh. Recorded live status shows it is usually busiest around 6 pm, and Amp Map measured 100% uptime and recorded 258 charging sessions here over the last 30 days. 24 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Instavolt, Mc Donalds (InstaVolt Ltd), 0.3 miles away.

Status

6 of 6 available

Checking status…

VerifiedLive status and details from POGO’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 100 kW4 connectors · 56p per kWh4 free
PoGo20011100% reliabilityAvailable
PoGo20011100% reliabilityAvailable
PoGo20012100% reliabilityAvailable
PoGo20012100% reliabilityAvailable
Type 2 · 7 kW2 connectors · 56p per kWh2 free
PoGo10013100% reliabilityAvailable
PoGo10013100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
POGO
Opening hours
Not published
Payment
In the PoGo Charge appRFID card
Charger ID
PoGo10013

Facilities

Hotel / inn

Always check directly with the charge point operator for the most up-to-date information.

Prices

56p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 100 kW CCS~36 min · ≈ 55 kWh · ~£31
Tesla Model 3 Rear-Wheel Drive 10–80% · 100 kW CCS~29 min · ≈ 40 kWh · ~£22
Audi Q4 e-tron 50 10–80% · 100 kW CCS~43 min · ≈ 51 kWh · ~£29
Hyundai IONIQ 5 10–80% · 100 kW CCS~32 min · ≈ 51 kWh · ~£28
MG Motor MG4 Trophy 10–80% · 100 kW CCS~34 min · ≈ 43 kWh · ~£24
Hyundai Kona Electric Long Range 10–80% · 100 kW CCS~40 min · ≈ 41 kWh · ~£23
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£16

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Holiday Inn Lincoln (POGO)?

The listed price is £0.56/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Holiday Inn Lincoln (POGO)?

Up to 100 kW DC via CCS, Type 2.

How many charging sockets does Holiday Inn Lincoln (POGO) have?

6 charging sockets: 4 × 100 kW CCS, 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Holiday Inn Lincoln (POGO) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 6 pm and quietest around 11 am. The live status on this page shows what is free before you set off.

How reliable is Holiday Inn Lincoln (POGO)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 258 observed charging sessions.

Who operates Holiday Inn Lincoln?

Holiday Inn Lincoln is on the POGO network.

Where is the nearest other charger with 50 kW or more to Holiday Inn Lincoln (POGO)?

Instavolt, Mc Donalds (InstaVolt Ltd) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Holiday Inn Lincoln (POGO)?

A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Holiday Inn Lincoln (POGO)?

A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Holiday Inn Lincoln (POGO)?

A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: POGO · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.