POGO · EV charging site
Pudding Lane
Pudding Lane, Maidstone, ME14 1LT
Pudding Lane is an EV charging site in Maidstone, Kent, run by POGO. Its 3 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the published price is £0.56 per kWh. Recorded live status shows it is usually busiest around 8 pm, and Amp Map measured 99% uptime and recorded 31 charging sessions here over the last 30 days. 11 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Maidstone, St Peters Wharf Retail Park (Source EV), 0.2 miles away.
Status
3 of 3 available
Checking status…
Connectors
CCS · 50 kW
CHAdeMO · 50 kW
Type 2 · 43 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- POGO
- Opening hours
- Not published
- Payment
- In the PoGo Charge appRFID card
- Charger ID
- SEC50216
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
56p per kWh
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pudding Lane (POGO)?
The listed price is £0.56/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Pudding Lane (POGO)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Pudding Lane (POGO) have?
3 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2. Live per-socket availability is shown on this page.
When is Pudding Lane (POGO) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 8 pm and quietest around 9 am. The live status on this page shows what is free before you set off.
How reliable is Pudding Lane (POGO)?
Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 31 observed charging sessions.
Who operates Pudding Lane?
Pudding Lane is on the POGO network.
Where is the nearest other charger with 50 kW or more to Pudding Lane (POGO)?
Maidstone, St Peters Wharf Retail Park (Source EV) is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pudding Lane (POGO)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pudding Lane (POGO)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pudding Lane (POGO)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Maidstone, St Peters Wharf Retail Park
- Pod Point Wickes Maidstone
- Pod Point King Street Car Park
- InstaVolt/McDonald's Hart Street
- Sessions House
- Pod Point Mote Road Car Park
- Cheapest nearby
- Pod Point Wickes Maidstone · 39.6p per kWh · 7 kW · 0.2 mi
- Fastest nearby
- Maidstone, St Peters Wharf Retail Park · 150 kW · 0.2 mi