Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

POGO · EV charging site

Travelodge Car Park Maypole

Travelodge Car Park Maypole, Shirley, B14 5JF

Travelodge Car Park Maypole is an EV charging site in Shirley, Solihull, run by POGO. All 4 of its sockets are 100 kW CCS, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 93% uptime and recorded 294 charging sessions here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Drawbridge Inn (Shirley) (evyve), 1.6 miles away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from POGO’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 100 kW4 connectors · 65p per kWh4 free
PoGo2001879% reliabilityAvailable
PoGo2001879% reliabilityAvailable
PoGo20019100% reliabilityAvailable
PoGo20019100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
POGO
Opening hours
Not published
Payment
In the PoGo Charge appRFID card
Charger ID
PoGo20018

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 100 kW CCS~36 min · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 100 kW CCS~29 min · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 100 kW CCS~43 min · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 100 kW CCS~32 min · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 100 kW CCS~34 min · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 100 kW CCS~40 min · ≈ 41 kWh · ~£26

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Travelodge Car Park Maypole (POGO)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Travelodge Car Park Maypole (POGO)?

Up to 100 kW DC via CCS.

How many charging sockets does Travelodge Car Park Maypole (POGO) have?

4 charging sockets: 4 × 100 kW CCS. Live per-socket availability is shown on this page.

When is Travelodge Car Park Maypole (POGO) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Travelodge Car Park Maypole (POGO)?

Amp Map measured 93% uptime here from recorded live status over the last 30 days, across 294 observed charging sessions.

Who operates Travelodge Car Park Maypole?

Travelodge Car Park Maypole is on the POGO network.

Where is the nearest other charger with 50 kW or more to Travelodge Car Park Maypole (POGO)?

Drawbridge Inn (Shirley) (evyve) is 1.6 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Travelodge Car Park Maypole (POGO)?

A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Travelodge Car Park Maypole (POGO)?

A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Travelodge Car Park Maypole (POGO)?

A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: POGO · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.