Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

POGO · EV charging site

Charleton Fruit Farm, Montrose

Charleton Fruit Farm, Hillside, DD10 9EW

Charleton Fruit Farm, Montrose is an EV charging site in Hillside, Angus, run by POGO. Its 4 sockets reach up to 100 kW, with CCS at the top speed, and the published price is £0.56 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 99% uptime and recorded 36 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Tool Station Montrose - 0184 (FOR EV), 1 mile away.

Status

2 of 4 available

Checking status…

VerifiedLive status and details from POGO’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 100 kW2 connectors · 56p per kWh2 in use
PoGo2018698% reliabilityCharging
PoGo2018698% reliabilityCharging
Type 2 · 22 kW2 connectors · 56p per kWh2 free
PoGo10027100% reliabilityAvailable
PoGo10027100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
POGO
Opening hours
Not published
Payment
In the PoGo Charge appRFID card
Charger ID
PoGo10027

Always check directly with the charge point operator for the most up-to-date information.

Prices

56p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 100 kW CCS~36 min · ≈ 55 kWh · ~£31
Tesla Model 3 Rear-Wheel Drive 10–80% · 100 kW CCS~29 min · ≈ 40 kWh · ~£22
Audi Q4 e-tron 50 10–80% · 100 kW CCS~43 min · ≈ 51 kWh · ~£29
Hyundai IONIQ 5 10–80% · 100 kW CCS~32 min · ≈ 51 kWh · ~£28
MG Motor MG4 Trophy 10–80% · 100 kW CCS~34 min · ≈ 43 kWh · ~£24
Hyundai Kona Electric Long Range 10–80% · 100 kW CCS~40 min · ≈ 41 kWh · ~£23
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£16

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Charleton Fruit Farm, Montrose (POGO)?

The listed price is £0.56/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Charleton Fruit Farm, Montrose (POGO)?

Up to 100 kW DC via Type 2, CCS.

How many charging sockets does Charleton Fruit Farm, Montrose (POGO) have?

4 charging sockets: 2 × 22 kW Type 2, 2 × 100 kW CCS. Live per-socket availability is shown on this page.

When is Charleton Fruit Farm, Montrose (POGO) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 8 am. The live status on this page shows what is free before you set off.

How reliable is Charleton Fruit Farm, Montrose (POGO)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 36 observed charging sessions.

Who operates Charleton Fruit Farm, Montrose?

Charleton Fruit Farm, Montrose is on the POGO network.

Where is the nearest other charger with 50 kW or more to Charleton Fruit Farm, Montrose (POGO)?

Tool Station Montrose - 0184 (FOR EV) is 1 mile away in a straight line, with up to 160 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Charleton Fruit Farm, Montrose (POGO)?

A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Charleton Fruit Farm, Montrose (POGO)?

A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Charleton Fruit Farm, Montrose (POGO)?

A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: POGO · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.