# Gateway Retail Park · POGO

Web page: https://ampmap.co.uk/charger/pogo-gateway-retail-park-uk

Gateway Retail Park is an EV charging site in Harwich, Essex, run by POGO. All 10 of its sockets are 200 kW CCS, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 94% uptime and recorded 240 charging sessions here over the last 30 days.

## Status

7 of 10 open at 22 Nov 2026, 19:02 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Gateway Retail Park, CO12 4EN
- **Area:** Harwich, Essex, United Kingdom
- **Coordinates (latitude, longitude):** 51.94061, 1.25876

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 200 kW | 10 | £0.65/kWh | 7 free, 2 in use, 1 out of service |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** POGO
- **Opening hours:** Not published
- **Payment:** In the PoGo Charge app; RFID card

## Common questions

### How much does it cost to charge at Gateway Retail Park (POGO)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Gateway Retail Park (POGO)?

Up to 200 kW DC via CCS.

### How many charging sockets does Gateway Retail Park (POGO) have?

10 charging sockets: 10 × 200 kW CCS. Live per-socket availability is shown on this page.

### When is Gateway Retail Park (POGO) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

### How reliable is Gateway Retail Park (POGO)?

Amp Map measured 94% uptime here from recorded live status over the last 30 days, across 240 observed charging sessions.

### Who operates Gateway Retail Park?

Gateway Retail Park is on the POGO network.

### How long does a Tesla Model Y Long Range take to charge at Gateway Retail Park (POGO)?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gateway Retail Park (POGO)?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Gateway Retail Park (POGO)?

A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Harwich](https://ampmap.co.uk/chargers/united-kingdom/essex/harwich)
- [POGO chargers](https://ampmap.co.uk/networks/pogo)

## Chargers near this site

- [McDonald's Harwich · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-mcdonald-s-harwich-uk) - CCS 200 kW · Williamsburg Avenue · From 89p/kWh
- [Orwell Car Park · Be.EV](https://ampmap.co.uk/charger/be-ev-orwell-car-park-uk) - CCS 50 kW, Type 2 22 kW · Orwell Car Park · From 59p/kWh
- [TDC Car Park · MER](https://ampmap.co.uk/charger/mer-tdc-car-park-uk) - Type 2 22 kW · Milton Road
- [The Quay Harwich · POGO](https://ampmap.co.uk/charger/evolt-network-the-quay-uk) - CCS 50 kW, CHAdeMO 50 kW · The Quay · From 56p/kWh
- [Nav House Nav House Publi · ChargePoint](https://ampmap.co.uk/charger/chargepoint-nav-house-nav-house-publi-uk) - Type 2 22 kW · 5 Angelgate
- [McDonald's Felixstowe · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-mcdonald-s-felixstowe-uk) - CCS 120 kW · Haven Exchange

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/pogo-gateway-retail-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: POGO (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
