# Govan Cross · POGO

Web page: https://ampmap.co.uk/charger/pogo-govan-cross-uk

Govan Cross is an EV charging site in Glasgow, Glasgow City, run by POGO. All 14 of its sockets are 200 kW CCS, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 97% uptime and recorded 199 charging sessions here over the last 30 days.

## Status

11 of 14 open at 22 Nov 2026, 16:59 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Govan Cross, G51 3UL
- **Area:** Glasgow, Glasgow City, United Kingdom
- **Coordinates (latitude, longitude):** 55.86264, -4.31405

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 200 kW | 14 | £0.65/kWh | 11 free, 1 out of service, 2 status unknown |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** POGO
- **Opening hours:** Not published
- **Payment:** In the PoGo Charge app; RFID card

## Common questions

### How much does it cost to charge at Govan Cross (POGO)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Govan Cross (POGO)?

Up to 200 kW DC via CCS.

### How many charging sockets does Govan Cross (POGO) have?

14 charging sockets: 14 × 200 kW CCS. Live per-socket availability is shown on this page.

### When is Govan Cross (POGO) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Govan Cross (POGO)?

Amp Map measured 97% uptime here from recorded live status over the last 30 days, across 199 observed charging sessions.

### Who operates Govan Cross?

Govan Cross is on the POGO network.

### How long does a Tesla Model Y Long Range take to charge at Govan Cross (POGO)?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Govan Cross (POGO)?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Govan Cross (POGO)?

A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Glasgow](https://ampmap.co.uk/chargers/united-kingdom/glasgow-city/glasgow)
- [POGO chargers](https://ampmap.co.uk/networks/pogo)

## Chargers near this site

- [Riverside Museum · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-riverside-museum-2-uk) - Type 2 22 kW · Riverside Museum Pier
- [SSEHUB001 · Evolt](https://ampmap.co.uk/charger/evolt-network-ssehub001-uk) - Type 2 150 kW · 290-330 Castlebank street
- [Riverside Museum · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-riverside-museum-uk) - CCS 50 kW, CHAdeMO 50 kW · 100 Pointhouse Road
- [Glasgow, Castlebank Street · Source EV](https://ampmap.co.uk/charger/source-ev-uk-glasgow-castlebank-street-uk) - CCS 150 kW · Castlebank Street · From 90p/kWh
- [Peel St. Car Club, Glasgow · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-peel-st-car-club-glasgow-uk) - Type 2 22 kW · Peel Street
- [Junction 24 Retail Park · Fastned](https://ampmap.co.uk/charger/fastned-junction-24-retail-park-uk) - CCS 300 kW, CCS / CHAdeMO 300 kW · Helen St · From 79p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/pogo-govan-cross-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: POGO (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
