Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

POGO · EV charging site

Grand National - Leisure Park

Ormskirk Road, Fazakerley, L9 5AD

Grand National - Leisure Park is an EV charging site in Fazakerley, Liverpool, run by POGO. All 8 of its sockets are 150 kW CCS, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 100% uptime and recorded 829 charging sessions here over the last 30 days. 21 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Aintree Racecourse (Chargemaster), 90 yards away.

Status

8 of 8 available

Checking status…

VerifiedLive status and details from POGO’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 150 kW8 connectors · 65p per kWh8 free
PoGo20055100% reliabilityAvailable
PoGo20055100% reliabilityAvailable
PoGo20056100% reliabilityAvailable
PoGo20056100% reliabilityAvailable
PoGo20057100% reliabilityAvailable
PoGo20057100% reliabilityAvailable
PoGo20058100% reliabilityAvailable
PoGo20058100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
POGO
Opening hours
Not published
Payment
In the PoGo Charge appRFID card
Charger ID
PoGo20055

Facilities

Leisure

Always check directly with the charge point operator for the most up-to-date information.

Prices

65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£26

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Grand National - Leisure Park (POGO)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Grand National - Leisure Park (POGO)?

Up to 150 kW DC via CCS.

How many charging sockets does Grand National - Leisure Park (POGO) have?

8 charging sockets: 8 × 150 kW CCS. Live per-socket availability is shown on this page.

When is Grand National - Leisure Park (POGO) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Grand National - Leisure Park (POGO)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 829 observed charging sessions.

Who operates Grand National - Leisure Park?

Grand National - Leisure Park is on the POGO network.

Where is the nearest other charger with 50 kW or more to Grand National - Leisure Park (POGO)?

Aintree Racecourse (Chargemaster) is 90 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Grand National - Leisure Park (POGO)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Grand National - Leisure Park (POGO)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Grand National - Leisure Park (POGO)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: POGO · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.