Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

POGO · EV charging site

Holiday Inn Birmingham

Holiday Inn Birmingham, Walsall, B43 7BG

Holiday Inn Birmingham is an EV charging site in Walsall, run by POGO. Its 12 sockets reach up to 200 kW, with CCS at the top speed, and the published price is £0.56 per kWh. Recorded live status shows it is usually busiest around 8 pm, and Amp Map measured 98% uptime and recorded 457 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge Shell Birmingham Road, 0.2 miles away.

Status

12 of 12 available

Checking status…

VerifiedLive status and details from POGO’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 200 kW6 connectors · 56p per kWh6 free
PoGo2000899% reliabilityAvailable
PoGo2000899% reliabilityAvailable
PoGo20009100% reliabilityAvailable
PoGo20009100% reliabilityAvailable
PoGo20010100% reliabilityAvailable
PoGo20010100% reliabilityAvailable
Type 2 · 7 kW6 connectors · 56p per kWh6 free
PoGo10010100% reliabilityAvailable
PoGo10010100% reliabilityAvailable
PoGo10011100% reliabilityAvailable
PoGo10011100% reliabilityAvailable
PoGo1001277% reliabilityAvailable
PoGo1001277% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
POGO
Opening hours
Not published
Payment
In the PoGo Charge appRFID card
Charger ID
PoGo10010

Facilities

Hotel / inn

Always check directly with the charge point operator for the most up-to-date information.

Prices

56p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 200 kW CCS~23 min · ≈ 55 kWh · ~£31
Tesla Model 3 Rear-Wheel Drive 10–80% · 200 kW CCS~23 min · ≈ 40 kWh · ~£22
Audi Q4 e-tron 50 10–80% · 200 kW CCS~39 min · ≈ 51 kWh · ~£29
Hyundai IONIQ 5 10–80% · 200 kW CCS~19 min · ≈ 51 kWh · ~£28
MG Motor MG4 Trophy 10–80% · 200 kW CCS~30 min · ≈ 43 kWh · ~£24
Hyundai Kona Electric Long Range 10–80% · 200 kW CCS~39 min · ≈ 41 kWh · ~£23
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£16

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Holiday Inn Birmingham (POGO)?

The listed price is £0.56/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Holiday Inn Birmingham (POGO)?

Up to 200 kW DC via CCS, Type 2.

How many charging sockets does Holiday Inn Birmingham (POGO) have?

12 charging sockets: 6 × 200 kW CCS, 6 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Holiday Inn Birmingham (POGO) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 8 pm and quietest around 10 am. The live status on this page shows what is free before you set off.

How reliable is Holiday Inn Birmingham (POGO)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 457 observed charging sessions.

Who operates Holiday Inn Birmingham?

Holiday Inn Birmingham is on the POGO network.

Where is the nearest other charger with 50 kW or more to Holiday Inn Birmingham (POGO)?

Shell Recharge Shell Birmingham Road is 0.2 miles away in a straight line, with up to 180 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Holiday Inn Birmingham (POGO)?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Holiday Inn Birmingham (POGO)?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Holiday Inn Birmingham (POGO)?

A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: POGO · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.