POGO · EV charging site
Horbury Road
Horbury Road, Wakefield, WF2 8UB
Horbury Road is an EV charging site in Wakefield, City and Borough of Wakefield, run by POGO. Both of its sockets are 200 kW CCS, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 53 charging sessions here over the last 30 days. 8 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Asda Wakefield Dewsbury Road (GeniePoint), 0.1 miles away.
Status
2 of 2 available
Checking status…
Connectors
CCS · 200 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- POGO
- Opening hours
- Not published
- Payment
- In the PoGo Charge appRFID card
- Charger ID
- PoGo20271
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
65p per kWh
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Horbury Road (POGO)?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Horbury Road (POGO)?
Up to 200 kW DC via CCS.
How many charging sockets does Horbury Road (POGO) have?
2 charging sockets: 2 × 200 kW CCS. Live per-socket availability is shown on this page.
When is Horbury Road (POGO) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Horbury Road (POGO)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 53 observed charging sessions.
Who operates Horbury Road?
Horbury Road is on the POGO network.
Where is the nearest other charger with 50 kW or more to Horbury Road (POGO)?
Asda Wakefield Dewsbury Road (GeniePoint) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Horbury Road (POGO)?
A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Horbury Road (POGO)?
A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Horbury Road (POGO)?
A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.