POGO · EV charging site
Market Car Park
12-16 Hockley Road, Rayleigh, SS6 8EB
Market Car Park is an EV charging site in Rayleigh, Essex, run by POGO. Its 5 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the published price is £0.56 per kWh. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 99% uptime and recorded 91 charging sessions here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Market Way Car Park (Evolt), 0.2 miles away.
Status
5 of 5 available
Checking status…
Connectors
CCS · 50 kW
CHAdeMO · 50 kW
Type 2 · 22 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- POGO
- Opening hours
- Not published
- Payment
- In the PoGo Charge appRFID card
- Charger ID
- SEC10688
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
56p per kWh
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Market Car Park (POGO)?
The listed price is £0.56/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Market Car Park (POGO)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Market Car Park (POGO) have?
5 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 3 × 22 kW Type 2. Live per-socket availability is shown on this page.
When is Market Car Park (POGO) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Market Car Park (POGO)?
Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 91 observed charging sessions.
Who operates Market Car Park?
Market Car Park is on the POGO network.
Where is the nearest other charger with 50 kW or more to Market Car Park (POGO)?
Market Way Car Park (Evolt) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Market Car Park (POGO)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Market Car Park (POGO)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Market Car Park (POGO)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Websters Way Car Park
- Market Way Car Park
- The Approach
- Travellers Joy (Rayleigh)
- Shell Recharge Shell Rayleigh
- Weir Retail Park, Stadium Way
- Fastest nearby
- Weir Retail Park, Stadium Way · 200 kW · 1 mi