Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

POGO · EV charging site

Mount Pleasant Road

33 Mount Pleasant Road, Royal Tunbridge Wells, TN1 1PN

Mount Pleasant Road is an EV charging site in Royal Tunbridge Wells, Kent, run by POGO. Its 3 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the published price is £0.56 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 96% uptime and recorded 176 charging sessions here over the last 30 days. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge Shell Little Waitrose St Johns, 0.6 miles away.

Status

1 of 3 available

Checking status…

VerifiedLive status and details from POGO’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 50 kW1 connector · 56p per kWh1 in use
SEC2055790% reliabilityCharging
CHAdeMO · 50 kW1 connector · 56p per kWhOut of service
SEC2055790% reliabilityOut of order
Type 2 · 43 kW1 connector · 56p per kWh1 free
SEC2055790% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
POGO
Opening hours
Not published
Payment
In the PoGo Charge appRFID card
Charger ID
SEC20557

Always check directly with the charge point operator for the most up-to-date information.

Prices

56p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£31
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£22
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£29
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£28
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£24
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£23
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£16

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Mount Pleasant Road (POGO)?

The listed price is £0.56/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Mount Pleasant Road (POGO)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Mount Pleasant Road (POGO) have?

3 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2. Live per-socket availability is shown on this page.

When is Mount Pleasant Road (POGO) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Mount Pleasant Road (POGO)?

Amp Map measured 96% uptime here from recorded live status over the last 30 days, across 176 observed charging sessions.

Who operates Mount Pleasant Road?

Mount Pleasant Road is on the POGO network.

Where is the nearest other charger with 50 kW or more to Mount Pleasant Road (POGO)?

Shell Recharge Shell Little Waitrose St Johns is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Mount Pleasant Road (POGO)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mount Pleasant Road (POGO)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Mount Pleasant Road (POGO)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: POGO · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.