# The Moor Centre · POGO

Web page: https://ampmap.co.uk/charger/pogo-the-moor-centre-uk

The Moor Centre is an EV charging site in Brierley Hill, Dudley, run by POGO. All 4 of its sockets are 200 kW CCS, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 9 am, and Amp Map measured 100% uptime and recorded 35 charging sessions here over the last 30 days.

## Status

4 of 4 open at 22 Nov 2026, 17:12 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 5 Bell Street, DY5 3AH
- **Area:** Brierley Hill, Dudley, United Kingdom
- **Coordinates (latitude, longitude):** 52.48084, -2.12399

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 200 kW | 4 | £0.65/kWh | 4 free |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** POGO
- **Opening hours:** Not published
- **Payment:** In the PoGo Charge app; RFID card

## Common questions

### How much does it cost to charge at The Moor Centre (POGO)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at The Moor Centre (POGO)?

Up to 200 kW DC via CCS.

### How many charging sockets does The Moor Centre (POGO) have?

4 charging sockets: 4 × 200 kW CCS. Live per-socket availability is shown on this page.

### When is The Moor Centre (POGO) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 9 am and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is The Moor Centre (POGO)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 35 observed charging sessions.

### Who operates The Moor Centre?

The Moor Centre is on the POGO network.

### How long does a Tesla Model Y Long Range take to charge at The Moor Centre (POGO)?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Moor Centre (POGO)?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at The Moor Centre (POGO)?

A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Brierley Hill](https://ampmap.co.uk/chargers/united-kingdom/dudley/brierley-hill)
- [POGO chargers](https://ampmap.co.uk/networks/pogo)

## Chargers near this site

- [Brierly Hill Dudley · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-brierly-hill-dudley-uk) - CHAdeMO 50 kW, Type 2 50 kW · Brierly Hill Dudley
- [Level Street, Brierly Hill - Public Car Park · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-level-street-brierly-hill-public-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Brierly Hill
- [Merry Hill Car Park P6 · Zest Charging](https://ampmap.co.uk/charger/zest-charging-merry-hill-car-park-p6-uk) - Type 2 22 kW · Central Way
- [Merry Hill, UK · Tesla](https://ampmap.co.uk/charger/tesla-merry-hill-supercharger-uk) - CCS 250 kW · Pedmore Road · From 25p/kWh
- [MFG Merry Hill · MFG EV Power](https://ampmap.co.uk/charger/mfg-ev-power-mfg-merry-hill-uk) - CCS 150 kW, CHAdeMO 50 kW · The Waterfront
- [zest-gold-type-plan · Zest Charging](https://ampmap.co.uk/charger/zest-charging-zest-gold-type-plan-uk) - Type 2 75 kW · The Embankment

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/pogo-the-moor-centre-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: POGO (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
