Project EV · EV charging site
Crowne Plaza Gerrards Cross
Oxford Road, Gerrards Cross, HP9 2XE
Crowne Plaza Gerrards Cross is an EV charging site in Gerrards Cross, Buckinghamshire, run by Project EV. Its 5 sockets reach up to 50 kW, with CCS at the top speed. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is EH - Extra Beaconsfield (GRIDSERVE), 1.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Project EV
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- 0800 599 9582
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Crowne Plaza Gerrards Cross (Project EV)?
Up to 50 kW DC via Type 2, CCS.
How many charging sockets does Crowne Plaza Gerrards Cross (Project EV) have?
5 charging sockets: 5 × 7 kW Type 2, 1 × 50 kW CCS.
Who operates Crowne Plaza Gerrards Cross?
Crowne Plaza Gerrards Cross is on the Project EV network. For site issues, the operator lists 0800 599 9582.
Where is the nearest other charger with 50 kW or more to Crowne Plaza Gerrards Cross (Project EV)?
EH - Extra Beaconsfield (GRIDSERVE) is 1.4 miles away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Crowne Plaza Gerrards Cross (Project EV)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Crowne Plaza Gerrards Cross (Project EV)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Crowne Plaza Gerrards Cross (Project EV)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- EH - Extra Beaconsfield
- IONITY GmbH IONITY Beaconsfield
- BP Gerrards Cross
- Gerrards Cross SF Connect
- Packhorse car park
- Ethorpe Hotel (Gerrards Cross)
- Cheapest nearby
- Packhorse car park · 65p per kWh · 7 kW · 1.9 mi
- Fastest nearby
- EH - Extra Beaconsfield · 400 kW · 1.4 mi