# Greenhead Hotel & Hostel LLP · Project EV

Web page: https://ampmap.co.uk/charger/project-ev-greenhead-hotel-and-hostel-llp-uk

Greenhead Hotel & Hostel LLP is an EV charging site in Greenhead, Northumberland, run by Project EV. It has a single 7 kW Type 2 socket, and the price is listed as Chargeable.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** A69, CA8 7HG
- **Area:** Greenhead, Northumberland, United Kingdom
- **Coordinates (latitude, longitude):** 54.98165, -2.53315

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Chargeable (from Open Charge Map)

## Site information

- **Operator:** Project EV
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How much does it cost to charge at Greenhead Hotel & Hostel LLP (Project EV)?

The listed price is Chargeable. Prices can change, so check the price at the charger before you start.

### How fast is charging at Greenhead Hotel & Hostel LLP (Project EV)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Greenhead Hotel & Hostel LLP (Project EV) have?

1 charging socket: 2 × 7 kW Type 2.

### Who operates Greenhead Hotel & Hostel LLP?

Greenhead Hotel & Hostel LLP is on the Project EV network. For site issues, the operator lists 0800 599 9582.

### How long does a Tesla Model Y Long Range take to charge at Greenhead Hotel & Hostel LLP (Project EV)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Greenhead Hotel & Hostel LLP (Project EV)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Greenhead Hotel & Hostel LLP (Project EV)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Greenhead](https://ampmap.co.uk/chargers/united-kingdom/northumberland/greenhead)
- [Project EV chargers](https://ampmap.co.uk/networks/project-ev)

## Chargers near this site

- [Walltown Quarry Country Park · Monta](https://ampmap.co.uk/charger/monta-walltown-quarry-country-park-uk) - Type 2 7 kW · Greenhead
- [Northumberland National Park](https://ampmap.co.uk/charger/northumberland-national-park-uk) - Type 2 7 kW · Walltown Quarry Country Park
- [Bush Nook Guest House · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-bush-nook-guest-house-uk) - J-1772 4 kW · Bush Nook
- [Haltwhistle leisure pool · evcharge.online](https://ampmap.co.uk/charger/evcharge-online-haltwhistle-leisure-pool-uk) - Type 2 7 kW · Greencroft
- [Railway Station Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-haltwhistle-railway-station-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Railway Station Car Park, Haltwhistle · From 89p/kWh
- [Park View Car Park 1, West Gate, Haltwhisle · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-park-view-car-park-1-west-gate-haltwhisle-uk) - Type 2 7 kW · West Gate

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/project-ev-greenhead-hotel-and-hostel-llp-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 5 Apr 2026).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
