Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Project EV · EV charging site

Harelands Courtyard Offices (1)

Moor Road, Darlington, DL10 5NN

Harelands Courtyard Offices (1) is an EV charging site in Darlington, run by Project EV. It has a single socket, with CCS at up to 40 kW. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Scotch Corner, UK (Tesla), 1.8 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 8 Apr 2026Last verified 8 Apr 2026

Connectors

CCS · 40 kW2 connectors

Site information

Operator
Project EV
Opening hours
Not published
Access
Public
Phone (from Open Charge Map)
0800 599 9582

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 40 kW CCS~87 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 40 kW CCS~63 min
Audi Q4 e-tron 50 10–80% · 40 kW CCS~81 min
Hyundai IONIQ 5 10–80% · 40 kW CCS~80 min
MG Motor MG4 Trophy 10–80% · 40 kW CCS~68 min
Hyundai Kona Electric Long Range 10–80% · 40 kW CCS~66 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Harelands Courtyard Offices (1) (Project EV)?

Up to 40 kW DC via CCS.

How many charging sockets does Harelands Courtyard Offices (1) (Project EV) have?

1 charging socket: 1 × 40 kW CCS, 1 × 40 kW CCS.

Who operates Harelands Courtyard Offices (1)?

Harelands Courtyard Offices (1) is on the Project EV network. For site issues, the operator lists 0800 599 9582.

Where is the nearest charger with 50 kW or more to Harelands Courtyard Offices (1) (Project EV)?

Scotch Corner, UK (Tesla) is 1.8 miles away in a straight line, with up to 130 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Harelands Courtyard Offices (1) (Project EV)?

A typical 10–80% rapid charge takes about 87 min on the 40 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Harelands Courtyard Offices (1) (Project EV)?

A typical 10–80% rapid charge takes about 63 min on the 40 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Harelands Courtyard Offices (1) (Project EV)?

A typical 10–80% rapid charge takes about 81 min on the 40 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 8 Apr 2026