Project EV · EV charging site
Harelands Courtyard Offices (1)
Moor Road, Darlington, DL10 5NN
Harelands Courtyard Offices (1) is an EV charging site in Darlington, run by Project EV. It has a single socket, with CCS at up to 40 kW. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Scotch Corner, UK (Tesla), 1.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Project EV
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0800 599 9582
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Harelands Courtyard Offices (1) (Project EV)?
Up to 40 kW DC via CCS.
How many charging sockets does Harelands Courtyard Offices (1) (Project EV) have?
1 charging socket: 1 × 40 kW CCS, 1 × 40 kW CCS.
Who operates Harelands Courtyard Offices (1)?
Harelands Courtyard Offices (1) is on the Project EV network. For site issues, the operator lists 0800 599 9582.
Where is the nearest charger with 50 kW or more to Harelands Courtyard Offices (1) (Project EV)?
Scotch Corner, UK (Tesla) is 1.8 miles away in a straight line, with up to 130 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Harelands Courtyard Offices (1) (Project EV)?
A typical 10–80% rapid charge takes about 87 min on the 40 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Harelands Courtyard Offices (1) (Project EV)?
A typical 10–80% rapid charge takes about 63 min on the 40 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Harelands Courtyard Offices (1) (Project EV)?
A typical 10–80% rapid charge takes about 81 min on the 40 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- EH - MOTO Scotch Corner · 59p per kWh · 360 kW · 1.8 mi
- Fastest nearby
- EH - MOTO Scotch Corner · 360 kW · 1.8 mi