# Harelands Courtyard Offices (1) · Project EV

Web page: https://ampmap.co.uk/charger/project-ev-harelands-courtyard-offices-1-uk

Harelands Courtyard Offices (1) is an EV charging site in Darlington, run by Project EV. It has a single socket, with CCS at up to 40 kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Moor Road, DL10 5NN
- **Area:** Darlington, United Kingdom
- **Coordinates (latitude, longitude):** 54.46038, -1.70344

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 40 kW | 2 | Not listed |

## Site information

- **Operator:** Project EV
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How fast is charging at Harelands Courtyard Offices (1) (Project EV)?

Up to 40 kW DC via CCS.

### How many charging sockets does Harelands Courtyard Offices (1) (Project EV) have?

1 charging socket: 1 × 40 kW CCS, 1 × 40 kW CCS.

### Who operates Harelands Courtyard Offices (1)?

Harelands Courtyard Offices (1) is on the Project EV network. For site issues, the operator lists 0800 599 9582.

### How long does a Tesla Model Y Long Range take to charge at Harelands Courtyard Offices (1) (Project EV)?

A typical 10–80% rapid charge takes about 87 min on the 40 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Harelands Courtyard Offices (1) (Project EV)?

A typical 10–80% rapid charge takes about 63 min on the 40 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Harelands Courtyard Offices (1) (Project EV)?

A typical 10–80% rapid charge takes about 81 min on the 40 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Darlington](https://ampmap.co.uk/chargers/united-kingdom/darlington/darlington)
- [Project EV chargers](https://ampmap.co.uk/networks/project-ev)

## Chargers near this site

- [Harelands Courtyard Offices · Monta](https://ampmap.co.uk/charger/monta-harelands-courtyard-offices-uk) - Type 2 22 kW · Moor Road
- [Scotch Corner, UK · Tesla](https://ampmap.co.uk/charger/scotch-corner-supercharger-tesla-only-uk) - CCS / Type 2 130 kW · Holiday Inn Darlington, A1 Scotch Corner · From 26p/kWh
- [EH - MOTO Scotch Corner · GRIDSERVE](https://ampmap.co.uk/charger/electric-highway-scotch-corner-moto-services-uk) - CCS 360 kW, CCS 350 kW · Middleton Tyas Ln · From 59p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/project-ev-harelands-courtyard-offices-1-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 8 Apr 2026).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
