Project EV · EV charging site
Pittington Community Association
Pittington Village Hall, Houghton-Le-Spring, DH6 1AN
Pittington Community Association is an EV charging site in Houghton-Le-Spring, Sunderland, run by Project EV. Both of its sockets are 7 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Durham, 1.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Project EV
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- 0800 599 9582
- Getting there
- Village Hall Car Park
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Pittington Community Association (Project EV)?
Up to 7 kW AC via Type 2.
How many charging sockets does Pittington Community Association (Project EV) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Pittington Community Association?
Pittington Community Association is on the Project EV network. For site issues, the operator lists 0800 599 9582.
Where is the nearest charger with 50 kW or more to Pittington Community Association (Project EV)?
Shell Recharge Shell Durham is 1.3 miles away in a straight line, with up to 175 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pittington Community Association (Project EV)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pittington Community Association (Project EV)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pittington Community Association (Project EV)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Ramside Hall Hotel
- Shell Recharge Shell Durham
- DCC Gymnastics Club 1
- Durham City Gymnastics Club
- DCC Belmont Park & Ride 2
- Durham Park and Ride Belmont
- Cheapest nearby
- Durham City Gymnastics Club · 59p per kWh · 7 kW · 1.4 mi
- Fastest nearby
- Shell Recharge Shell Durham · 175 kW · 1.3 mi