Project EV · EV charging site
SM Recreation Ground 1478
Steeple Morden, Royston, SG8 0NQ
SM Recreation Ground 1478 is an EV charging site in Royston, Hertfordshire, run by Project EV. Both of its sockets are 7 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is McDonald's Royston (InstaVolt Ltd), 3.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Project EV
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- 0800 599 9582
- Getting there
- To North of Village Hall
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at SM Recreation Ground 1478 (Project EV)?
Up to 7 kW AC via Type 2.
How many charging sockets does SM Recreation Ground 1478 (Project EV) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates SM Recreation Ground 1478?
SM Recreation Ground 1478 is on the Project EV network. For site issues, the operator lists 0800 599 9582.
Where is the nearest charger with 50 kW or more to SM Recreation Ground 1478 (Project EV)?
McDonald's Royston (InstaVolt Ltd) is 3.4 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at SM Recreation Ground 1478 (Project EV)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at SM Recreation Ground 1478 (Project EV)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at SM Recreation Ground 1478 (Project EV)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- McDonald's Royston · 120 kW · 3.4 mi