Project EV · EV charging site
The Sidings
Cathedral Avenue, Mendip, BA5 1LJ
The Sidings is an EV charging site in Mendip, Somerset, run by Project EV. All 4 of its sockets are 50 kW CCS, and the price is listed as £0.70/kWh. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons Wells (GeniePoint), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Project EV
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.70/kWh(from Open Charge Map, 4 Jul 2023)
- Phone (from Open Charge Map)
- 0800 599 9582
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Sidings (Project EV)?
The listed price is £0.70/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at The Sidings (Project EV)?
Up to 50 kW DC via CCS.
How many charging sockets does The Sidings (Project EV) have?
4 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CCS, 1 × 50 kW CCS, 1 × 50 kW CCS.
Who operates The Sidings?
The Sidings is on the Project EV network. For site issues, the operator lists 0800 599 9582.
Where is the nearest other charger with 50 kW or more to The Sidings (Project EV)?
Morrisons Wells (GeniePoint) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Sidings (Project EV)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Sidings (Project EV)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Sidings (Project EV)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- R Tincknell & Son Ltd - SLG0C28020
- Morrisons Wells
- South Street Car Park, Wells 1
- Pod Point Tesco Superstore - Wells
- Union Street Car Park 1
- Best Western Plus Swan Hotel
- Cheapest nearby
- Pod Point Tesco Superstore - Wells · 44.4p per kWh · 7 kW · 0.4 mi