EV charging site
Quadrant:MK staff car park
Elder Gate, Milton Keynes, MK9 1BB
Quadrant:MK staff car park is an EV charging site in Milton Keynes. Its 15 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free. 39 other charging sites are listed within a mile, and the nearest site with 50 kW or more is McDonald's Milton Keynes (InstaVolt Ltd), 140 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free(from Open Charge Map, 20 Aug 2019)
- Getting there
- Ground floor of car park
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Quadrant:MK staff car park?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Quadrant:MK staff car park?
Up to 7 kW AC via Type 2.
How many charging sockets does Quadrant:MK staff car park have?
15 charging sockets: 3 × 3 kW Type 2, 6 × 7 kW Type 2.
Can anyone charge at Quadrant:MK staff car park?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Quadrant:MK staff car park?
McDonald's Milton Keynes (InstaVolt Ltd) is 140 yards away in a straight line, with up to 63 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Quadrant:MK staff car park?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Quadrant:MK staff car park?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Quadrant:MK staff car park?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- McDonald's Milton Keynes
- North Second Street
- Travelodge extension
- Travelodge - Silbury Boulevard
- Silbury Boulevard
- Bouverie House - Silbury Boulevard
- Cheapest nearby
- Travelodge - Silbury Boulevard · 65p per kWh · 50 kW · 0.2 mi
- Fastest nearby
- McDonald's Milton Keynes · 63 kW · 140 yd