# Doddington Hall · Qwello

Web page: https://ampmap.co.uk/charger/qwello-doddington-hall-uk

Doddington Hall is an EV charging site in Lincoln, Lincolnshire, run by Qwello. Its 5 sockets reach up to 22 kW, with Type 2 at the top speed, and the price is listed as £0.42/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Main Street, LN6 4RU
- **Area:** Lincoln, Lincolnshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.21831, -0.65262

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 5 | Not listed |
| Type 2 | 11 kW | 5 | Not listed |

- **Price:** £0.42/kWh (from Open Charge Map)

## Site information

- **Operator:** Qwello
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Doddington Hall (Qwello)?

The listed price is £0.42/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Doddington Hall (Qwello)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Doddington Hall (Qwello) have?

5 charging sockets: 1 × 22 kW Type 2, 1 × 11 kW Type 2, 1 × 22 kW Type 2, 1 × 11 kW Type 2, 1 × 22 kW Type 2, 1 × 11 kW Type 2, 1 × 22 kW Type 2, 1 × 11 kW Type 2, 1 × 22 kW Type 2, 1 × 11 kW Type 2.

### Who operates Doddington Hall?

Doddington Hall is on the Qwello network. For site issues, the operator lists +442080162444.

### How long does a Tesla Model Y Long Range take to charge at Doddington Hall (Qwello)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Doddington Hall (Qwello)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Doddington Hall (Qwello)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Lincoln](https://ampmap.co.uk/chargers/united-kingdom/lincolnshire/lincoln)
- [Cheapest charging in Lincoln](https://ampmap.co.uk/chargers/united-kingdom/lincolnshire/lincoln/cheapest)

## Chargers near this site

- [Lincoln EV Hub · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-lincoln-ev-hub-uk) - CCS 300 kW, CHAdeMO 100 kW · Lincoln EV Hub · From 89p/kWh
- [Windmill Farm (Lincoln) · evyve](https://ampmap.co.uk/charger/evyve-windmill-farm-lincoln-uk) - CCS 75 kW · Whisby Road · From 85p/kWh
- [Lincoln, UK · Tesla](https://ampmap.co.uk/charger/tesla-lincoln-uk-uk) - CCS 250 kW · 1, Turnstone Rd · From 32p/kWh
- [DEA Aviation Limited](https://ampmap.co.uk/charger/dea-aviation-limited-uk) - Type 2 7 kW · Unit 3
- [HU - Moorland Way · GRIDSERVE](https://ampmap.co.uk/charger/electric-highway-moorland-centre-lincoln-uk) - CCS 180 kW, CHAdeMO 80 kW · Moorland Way · From 85p/kWh
- [Burtonwaters 1 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-burtonwaters-1-uk) - Type 2 22 kW · 3 Burton Lane End

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/qwello-doddington-hall-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 12 Sept 2024).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
