EV charging site
Rabbit Hill Country Store
Rabbit Hill Business Park , Great North Road, Harrogate, HG5 0FF
Rabbit Hill Country Store is an EV charging site in Harrogate, North Yorkshire. It has a single 22 kW Type 2 socket, and the price is listed as 45p via Chargepoint App. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Back Lane Car park (BP Pulse), 3.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Price
- 45p via Chargepoint App(from Open Charge Map, 2 Aug 2022)
- Notes
- One dual socket 22kW charger in front of the Country Store. Chargepoint App needed
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Rabbit Hill Country Store?
The listed price is 45p via Chargepoint App. Prices can change, so check the price at the charger before you start.
How fast is charging at Rabbit Hill Country Store?
Up to 22 kW AC via Type 2.
How many charging sockets does Rabbit Hill Country Store have?
1 charging socket: 2 × 22 kW Type 2.
Where is the nearest charger with 50 kW or more to Rabbit Hill Country Store?
Back Lane Car park (BP Pulse) is 3.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Rabbit Hill Country Store?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rabbit Hill Country Store?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Rabbit Hill Country Store?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Goldsborough Hall
- Pod Point Vasstech Ltd - Knaresborough
- St James Retail Park
- Knaresborough Wellness Centre
- Cheapest nearby
- Pod Point Vasstech Ltd - Knaresborough · 45.6p per kWh · 22 kW · 3.6 mi
- Fastest nearby
- St James Retail Park · 150 kW · 3.9 mi