# Rainbow Productions

Web page: https://ampmap.co.uk/charger/rainbow-productions-uk

Rainbow Productions is an EV charging site in Farnham, Surrey, run by Rainbow Productions and open 24 hours a day. All 4 of its sockets are 22 kW Type 2. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 100% uptime and recorded 7 charging sessions here over the last 30 days.

## Status

4 of 4 open at 22 Nov 2026, 16:28 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** South Street, GU9 7QQ
- **Area:** Farnham, Surrey, United Kingdom
- **Coordinates (latitude, longitude):** 51.21277, -0.79454

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 4 | Not listed | 4 free |

## Site information

- **Operator:** Rainbow Productions
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Rainbow Productions?

Up to 22 kW AC via Type 2.

### How many charging sockets does Rainbow Productions have?

4 charging sockets: 4 × 22 kW Type 2. Live per-socket availability is shown on this page.

### Is Rainbow Productions open 24/7?

Yes - Rainbow Productions is open 24 hours a day, 7 days a week.

### When is Rainbow Productions busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Rainbow Productions?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 7 observed charging sessions.

### Who operates Rainbow Productions?

Rainbow Productions is on the Rainbow Productions network.

### How long does a Tesla Model Y Long Range take to charge at Rainbow Productions?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rainbow Productions?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Rainbow Productions?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Farnham](https://ampmap.co.uk/chargers/united-kingdom/surrey/farnham)

## Chargers near this site

- [WaverleyBC · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-waverleybc-uk) - CHAdeMO 50 kW, Type 2 50 kW · Victoria Rd
- [Lidl-Farnham](https://ampmap.co.uk/charger/lidl-farnham-uk) - CCS 50 kW, CHAdeMO 50 kW · East Street
- [Riverside 3 Car Park · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-riverside-3-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Mike Hawthorn Drive
- [Shell Recharge Shell Little Waitrose Folly Hill](https://ampmap.co.uk/charger/shell-recharge-shell-little-waitrose-folly-hill-uk) - CCS / CHAdeMO 180 kW · Odiham Rd, Upper Hale Rd · From 89p/kWh
- [Islamabad (Tilford) Public Car Park · ChargePoint](https://ampmap.co.uk/charger/chargepoint-islamabad-tilford-public-car-park-uk) - Type 2 22 kW · Sheephatch Lane
- [HU - Aldershot South · GRIDSERVE](https://ampmap.co.uk/charger/gridserve-hu-aldershot-south-uk) - CCS 400 kW · Tongham Road, Junction of A331 and A31 · From 85p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/rainbow-productions-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Rainbow Productions (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
