Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Ravensthorpe Retail Parks

Huddersfield Road, Mirfield, WF13 3HN

Ravensthorpe Retail Parks is an EV charging site in Mirfield, Kirklees, run by Be.EV and open 24 hours a day. Its 8 sockets reach up to 80 kW, with CCS at the top speed, and published prices run from £0.59 to £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 276 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is The Swan Service Station (BP Pulse), 0.6 miles away.

Status

8 of 8 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 80 kW6 connectors · 89p per kWh6 free
KM0082-01100% reliabilityAvailable
KM0082-02100% reliabilityAvailable
KM0082-03100% reliabilityAvailable
KM0082-04100% reliabilityAvailable
KM0082-05100% reliabilityAvailable
KM0082-06100% reliabilityAvailable
Type 2 · 22 kW2 connectors · 59p per kWh2 free
AD00640-1100% reliabilityAvailable
AD00640-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
AD00640-1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS80 kW89p per kWh
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 80 kW CCS~44 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 80 kW CCS~33 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 80 kW CCS~47 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 80 kW CCS~40 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 80 kW CCS~38 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 80 kW CCS~42 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Ravensthorpe Retail Parks (Be.EV)?

The listed price is CCS £0.89/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Ravensthorpe Retail Parks (Be.EV)?

Up to 80 kW DC via CCS, Type 2.

How many charging sockets does Ravensthorpe Retail Parks (Be.EV) have?

8 charging sockets: 6 × 80 kW CCS, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Ravensthorpe Retail Parks (Be.EV) open 24/7?

Yes - Ravensthorpe Retail Parks (Be.EV) is open 24 hours a day, 7 days a week.

When is Ravensthorpe Retail Parks (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Ravensthorpe Retail Parks (Be.EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 276 observed charging sessions.

Who operates Ravensthorpe Retail Parks?

Ravensthorpe Retail Parks is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Ravensthorpe Retail Parks (Be.EV)?

The Swan Service Station (BP Pulse) is 0.6 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Ravensthorpe Retail Parks (Be.EV)?

A typical 10–80% rapid charge takes about 44 min on the 80 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ravensthorpe Retail Parks (Be.EV)?

A typical 10–80% rapid charge takes about 33 min on the 80 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Ravensthorpe Retail Parks (Be.EV)?

A typical 10–80% rapid charge takes about 47 min on the 80 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.