Recharge (Formerly Fortum Charge & Drive) · EV charging site
Q-Park Shambles
Garden Place, York, YO1 7NT
Q-Park Shambles is an EV charging site in York, City of York, run by Recharge (Formerly Fortum Charge & Drive). Both of its sockets are 22 kW Type 2. 22 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Morrisons York (GeniePoint), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.30/kWh. Parking fees apply.(from Open Charge Map, 20 Aug 2017)
- Phone (from Open Charge Map)
- +358 20 33 4455
- Getting there
- 1st floor
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Q-Park Shambles (Recharge (Formerly Fortum Charge & Drive))?
The listed price is £0.30/kWh. Parking fees apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at Q-Park Shambles (Recharge (Formerly Fortum Charge & Drive))?
Up to 22 kW AC via Type 2.
How many charging sockets does Q-Park Shambles (Recharge (Formerly Fortum Charge & Drive)) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Q-Park Shambles?
Q-Park Shambles is on the Recharge (Formerly Fortum Charge & Drive) network. For site issues, the operator lists +358 20 33 4455.
Where is the nearest charger with 50 kW or more to Q-Park Shambles (Recharge (Formerly Fortum Charge & Drive))?
Morrisons York (GeniePoint) is 0.2 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Q-Park Shambles (Recharge (Formerly Fortum Charge & Drive))?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Q-Park Shambles (Recharge (Formerly Fortum Charge & Drive))?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Q-Park Shambles (Recharge (Formerly Fortum Charge & Drive))?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Q Parks Shambles, York 1
- Morrisons York
- The Gym York
- Castle Car Park
- Morrisons York Foss Islands
- Double Tree by Hilton York
- Fastest nearby
- Morrisons York · 60 kW · 0.2 mi