Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

Red Lane industrial estate

Red Lane, Coventry, CV6 5RY

Red Lane industrial estate is an EV charging site in Coventry. It has a single 4 kW Type 2 socket, and charging is listed as free. 79 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 14 Red Lane, 0.3 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 3 Jun 2017Last verified 3 Jun 2017

Connectors

Type 2 · 4 kW1 connector

Site information

Opening hours
Not published
Access
Private · notice required
Price
Free(from Open Charge Map, 3 Jun 2017)
Getting there
Electric centre

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 4 kW Type 2~13h 50m
Tesla Model 3 Rear-Wheel Drive 10–80% · 4 kW Type 2~9h 59m
Audi Q4 e-tron 50 10–80% · 4 kW Type 2~12h 46m
Hyundai IONIQ 5 10–80% · 4 kW Type 2~12h 42m
MG Motor MG4 Trophy 10–80% · 4 kW Type 2~10h 40m
Hyundai Kona Electric Long Range 10–80% · 4 kW Type 2~10h 9m
Nissan LEAF 10–80% · 4 kW Type 2~7h 0m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Red Lane industrial estate?

The listed price is Free. Prices can change, so check the price at the charger before you start.

How fast is charging at Red Lane industrial estate?

Up to 4 kW AC via Type 2.

How many charging sockets does Red Lane industrial estate have?

1 charging socket: 1 × 4 kW Type 2.

Can anyone charge at Red Lane industrial estate?

The operator lists this charger as private - access is restricted.

Where is the nearest charger with 50 kW or more to Red Lane industrial estate?

14 Red Lane is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Red Lane industrial estate?

A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Red Lane industrial estate?

A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Red Lane industrial estate?

A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 3 Jun 2017

Amp Map does not take payment. You pay the operator.