Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

Red Meadow Car Park Ross on Wye - 70536

Red Meadow, Hereford, HR9 7DB

Red Meadow Car Park Ross on Wye - 70536 is an EV charging site in Hereford, Herefordshire. Both of its sockets are 4 kW Type 2. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Edde Cross Car Park (POGO), 0.1 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 May 2023Last verified 4 May 2023

Connectors

Type 2 · 4 kW2 connectors

Site information

Opening hours
Not published
Access
Public · membership required · access key required
Getting there
Two bays near public convenience. Long stay.

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 4 kW Type 2~13h 50m
Tesla Model 3 Rear-Wheel Drive 10–80% · 4 kW Type 2~9h 59m
Audi Q4 e-tron 50 10–80% · 4 kW Type 2~12h 46m
Hyundai IONIQ 5 10–80% · 4 kW Type 2~12h 42m
MG Motor MG4 Trophy 10–80% · 4 kW Type 2~10h 40m
Hyundai Kona Electric Long Range 10–80% · 4 kW Type 2~10h 9m
Nissan LEAF 10–80% · 4 kW Type 2~7h 0m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Red Meadow Car Park Ross on Wye - 70536?

Up to 4 kW AC via Type 2.

How many charging sockets does Red Meadow Car Park Ross on Wye - 70536 have?

2 charging sockets: 1 × 4 kW Type 2, 1 × 4 kW Type 2.

Where is the nearest charger with 50 kW or more to Red Meadow Car Park Ross on Wye - 70536?

Edde Cross Car Park (POGO) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Red Meadow Car Park Ross on Wye - 70536?

A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Red Meadow Car Park Ross on Wye - 70536?

A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Red Meadow Car Park Ross on Wye - 70536?

A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 4 May 2023

Amp Map does not take payment. You pay the operator.