# Red Meadow Car Park Ross on Wye - 70536

Web page: https://ampmap.co.uk/charger/red-meadow-car-park-ross-on-wye-70536-uk

Red Meadow Car Park Ross on Wye - 70536 is an EV charging site in Hereford, Herefordshire. Both of its sockets are 4 kW Type 2.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Red Meadow, HR9 7DB
- **Area:** Hereford, Herefordshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.91663, -2.58291
- **Getting there:** Two bays near public convenience. Long stay.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 4 kW | 2 | Not listed |

## Site information

- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How fast is charging at Red Meadow Car Park Ross on Wye - 70536?

Up to 4 kW AC via Type 2.

### How many charging sockets does Red Meadow Car Park Ross on Wye - 70536 have?

2 charging sockets: 1 × 4 kW Type 2, 1 × 4 kW Type 2.

### How long does a Tesla Model Y Long Range take to charge at Red Meadow Car Park Ross on Wye - 70536?

A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Red Meadow Car Park Ross on Wye - 70536?

A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Red Meadow Car Park Ross on Wye - 70536?

A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Hereford](https://ampmap.co.uk/chargers/united-kingdom/herefordshire/hereford)

## Chargers near this site

- [Edde Cross Car Park · POGO](https://ampmap.co.uk/charger/evolt-network-edde-cross-street-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Trenchard Street · From 56p/kWh
- [Morrisons Ross On Wye · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-ross-on-wye-uk) - CCS 50 kW, CHAdeMO 50 kW · Station Street
- [Wharton Lodge Cottages · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-wharton-lodge-cottages-uk) - Type 2 7 kW · Wharton Lodge

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/red-meadow-car-park-ross-on-wye-70536-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 4 May 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
