Roam Charging · EV charging site
BizSpace iMex Centre
575-599 Maxted Road, Hemel Hempstead, HP2 7DX
BizSpace iMex Centre is an EV charging site in Hemel Hempstead, Hertfordshire, run by Roam Charging. All 8 of its sockets are 22 kW Type 2. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Wood Lane Car Park, Hemel Hempstead (Osprey Charging), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Roam Charging
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- 0330 111 2999
- Notes
- Bespoke app, user registration and pre-pay account required.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at BizSpace iMex Centre (Roam Charging)?
Up to 22 kW AC via Type 2.
How many charging sockets does BizSpace iMex Centre (Roam Charging) have?
8 charging sockets: 4 × 22 kW Type 2.
Who operates BizSpace iMex Centre?
BizSpace iMex Centre is on the Roam Charging network. For site issues, the operator lists 0330 111 2999.
Where is the nearest charger with 50 kW or more to BizSpace iMex Centre (Roam Charging)?
Wood Lane Car Park, Hemel Hempstead (Osprey Charging) is 0.6 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at BizSpace iMex Centre (Roam Charging)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at BizSpace iMex Centre (Roam Charging)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at BizSpace iMex Centre (Roam Charging)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Swarco UK Ltd
- Wood Lane Car Park, Hemel Hempstead
- Shell Recharge Shell Hemel Hempstead
- Breakspear Way SF Connect
- Green Man Hemel Hempstead
- SPAR Leverstock Green, Hemel Hempstead
- Cheapest nearby
- Wood Lane Car Park, Hemel Hempstead · 89p per kWh · 60 kW · 0.6 mi
- Fastest nearby
- Shell Recharge Shell Hemel Hempstead · 300 kW · 0.8 mi