Roam Charging · EV charging site
KFC Milton Keynes East - Towergate
Towergate Roundabout, Milton Keynes, MK17 8US
KFC Milton Keynes East - Towergate is an EV charging site in Milton Keynes, run by Roam Charging. Both of its sockets are 140 kW CCS. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Wavendon Gate SF Connect (BP Pulse), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Roam Charging
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- 0330 111 2999
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at KFC Milton Keynes East - Towergate (Roam Charging)?
Up to 140 kW DC via CCS.
How many charging sockets does KFC Milton Keynes East - Towergate (Roam Charging) have?
2 charging sockets: 2 × 140 kW CCS.
Who operates KFC Milton Keynes East - Towergate?
KFC Milton Keynes East - Towergate is on the Roam Charging network. For site issues, the operator lists 0330 111 2999.
Where is the nearest other charger with 50 kW or more to KFC Milton Keynes East - Towergate (Roam Charging)?
Wavendon Gate SF Connect (BP Pulse) is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at KFC Milton Keynes East - Towergate (Roam Charging)?
A typical 10–80% rapid charge takes about 28 min on the 140 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at KFC Milton Keynes East - Towergate (Roam Charging)?
A typical 10–80% rapid charge takes about 24 min on the 140 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at KFC Milton Keynes East - Towergate (Roam Charging)?
A typical 10–80% rapid charge takes about 39 min on the 140 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Wavendon Gate SF Connect
- Tenterden Crescent
- Blackberry Court
- Hinehead Knoll
- Hawkhurst Gate
- Brooklands Health Centre
- Cheapest nearby
- Blackberry Court · 65p per kWh · 50 kW · 0.8 mi
- Fastest nearby
- Wavendon Gate SF Connect · 150 kW · 0.2 mi