Roam Charging · EV charging site
Midmill Parade
Kintore, Aberdeen, AB51 0UY
Midmill Parade is an EV charging site in Aberdeen, Aberdeen City, run by Roam Charging. Both of its sockets are 100 kW CCS, and the price is listed as £1.00/connection+£0.69/kWh. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Thainstone Mart (Chargeplace Scotland), 2.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Roam Charging
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £1.00/connection+£0.69/kWh(from Open Charge Map, 16 Aug 2024)
- Phone (from Open Charge Map)
- 0330 111 2999
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Midmill Parade (Roam Charging)?
The listed price is £1.00/connection+£0.69/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Midmill Parade (Roam Charging)?
Up to 100 kW DC via CCS.
How many charging sockets does Midmill Parade (Roam Charging) have?
2 charging sockets: 2 × 100 kW CCS.
Who operates Midmill Parade?
Midmill Parade is on the Roam Charging network. For site issues, the operator lists 0330 111 2999.
Where is the nearest other charger with 50 kW or more to Midmill Parade (Roam Charging)?
Thainstone Mart (Chargeplace Scotland) is 2.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Midmill Parade (Roam Charging)?
A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Midmill Parade (Roam Charging)?
A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Midmill Parade (Roam Charging)?
A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.