# Midmill Parade · Roam Charging

Web page: https://ampmap.co.uk/charger/roam-charging-midmill-parade-uk

Midmill Parade is an EV charging site in Aberdeen, Aberdeen City, run by Roam Charging. Both of its sockets are 100 kW CCS, and the price is listed as £1.00/connection+£0.69/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Kintore, AB51 0UY
- **Area:** Aberdeen, Aberdeen City, United Kingdom
- **Coordinates (latitude, longitude):** 57.22626, -2.34615

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 100 kW | 2 | Not listed |

- **Price:** £1.00/connection+£0.69/kWh (from Open Charge Map)

## Site information

- **Operator:** Roam Charging
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Midmill Parade (Roam Charging)?

The listed price is £1.00/connection+£0.69/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Midmill Parade (Roam Charging)?

Up to 100 kW DC via CCS.

### How many charging sockets does Midmill Parade (Roam Charging) have?

2 charging sockets: 2 × 100 kW CCS.

### Who operates Midmill Parade?

Midmill Parade is on the Roam Charging network. For site issues, the operator lists 0330 111 2999.

### How long does a Tesla Model Y Long Range take to charge at Midmill Parade (Roam Charging)?

A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Midmill Parade (Roam Charging)?

A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Midmill Parade (Roam Charging)?

A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Aberdeen](https://ampmap.co.uk/chargers/united-kingdom/aberdeen-city/aberdeen)
- [Cheapest charging in Aberdeen](https://ampmap.co.uk/chargers/united-kingdom/aberdeen-city/aberdeen/cheapest)
- [Roam Charging chargers](https://ampmap.co.uk/networks/roam-charging)

## Chargers near this site

- [Thainstone Mart · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-thainstone-mart-uk) - CCS 50 kW, CHAdeMO 50 kW · Off A96
- [Thainstone House, Inverurie · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-thainstone-house-inverurie-uk) - Type 2 22 kW · Thainstone House

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/roam-charging-midmill-parade-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 16 Aug 2024).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
