RWE / Npower · EV charging site
Carver Lane Car Park
Carver Lane, Sheffield, S1 4FS
Carver Lane Car Park is an EV charging site in Sheffield, run by RWE / Npower. Both of its sockets are 22 kW Type 2. 20 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Trinity Street Car Park, Sheffield 2 (Blink Charging), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- RWE / Npower
- Opening hours
- Not published
- Access
- Public
- Price
- Free. Parking fees apply.(from Open Charge Map, 9 Mar 2016)
- Notes
- No cards are required to use these points but parking fees are applicable.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Carver Lane Car Park (RWE / Npower)?
The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at Carver Lane Car Park (RWE / Npower)?
Up to 22 kW AC via Type 2.
How many charging sockets does Carver Lane Car Park (RWE / Npower) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Carver Lane Car Park?
Carver Lane Car Park is on the RWE / Npower network.
Where is the nearest charger with 50 kW or more to Carver Lane Car Park (RWE / Npower)?
Trinity Street Car Park, Sheffield 2 (Blink Charging) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Carver Lane Car Park (RWE / Npower)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Carver Lane Car Park (RWE / Npower)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Carver Lane Car Park (RWE / Npower)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.