RWE / Npower · EV charging site
Chamber Road
Chamber Road, Doncaster, DN1 3BN
Chamber Road is an EV charging site in Doncaster, run by RWE / Npower. Both of its sockets are 22 kW Type 2. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Greggs Carr House Road, Doncaster (Osprey Charging), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- RWE / Npower
- Opening hours
- Not published
- Access
- Public
- Price
- Free. Parking fees apply.(from Open Charge Map, 9 Mar 2016)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Chamber Road (RWE / Npower)?
The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at Chamber Road (RWE / Npower)?
Up to 22 kW AC via Type 2.
How many charging sockets does Chamber Road (RWE / Npower) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Chamber Road?
Chamber Road is on the RWE / Npower network.
Where is the nearest charger with 50 kW or more to Chamber Road (RWE / Npower)?
Greggs Carr House Road, Doncaster (Osprey Charging) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Chamber Road (RWE / Npower)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Chamber Road (RWE / Npower)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Chamber Road (RWE / Npower)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Civic Quarter Car Park, Doncaster 1
- Greggs Carr House Road, Doncaster
- Wool Market Car Park, Doncaster 1
- Doncaster Market
- EVC Prime Lodge Doncaster
- Centurion Retail Park
- Cheapest nearby
- Greggs Carr House Road, Doncaster · 89p per kWh · 50 kW · 0.4 mi
- Fastest nearby
- Centurion Retail Park · 150 kW · 1.1 mi