# Charging Station npower · RWE / Npower

Web page: https://ampmap.co.uk/charger/rwe-npower-charging-station-npower-uk

Charging Station npower is an EV charging site in Swindon, Borough of Swindon, run by RWE / Npower. It has a single 22 kW Type 2 socket, and the price is listed as Charges May Apply.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Windmill Hill Business Park, SN5 6PB
- **Area:** Swindon, Borough of Swindon, United Kingdom
- **Coordinates (latitude, longitude):** 51.54900, -1.84603
- **Getting there:** Gated business park, gates closed at weekends.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** Charges May Apply (from Open Charge Map)

## Site information

- **Operator:** RWE / Npower
- **Opening hours:** Not published
- **Access:** Private · membership required

## Common questions

### How much does it cost to charge at Charging Station npower (RWE / Npower)?

The listed price is Charges May Apply. Prices can change, so check the price at the charger before you start.

### How fast is charging at Charging Station npower (RWE / Npower)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Charging Station npower (RWE / Npower) have?

1 charging socket: 2 × 22 kW Type 2.

### Who operates Charging Station npower?

Charging Station npower is on the RWE / Npower network.

### Can anyone charge at Charging Station npower (RWE / Npower)?

The operator lists this charger as private - access is restricted.

### How long does a Tesla Model Y Long Range take to charge at Charging Station npower (RWE / Npower)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Charging Station npower (RWE / Npower)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Charging Station npower (RWE / Npower)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Swindon](https://ampmap.co.uk/chargers/united-kingdom/borough-of-swindon/swindon)
- [Cheapest charging in Swindon](https://ampmap.co.uk/chargers/united-kingdom/borough-of-swindon/swindon/cheapest)
- [RWE / Npower chargers](https://ampmap.co.uk/networks/rwe-npower)

## Chargers near this site

- [Ids Swindon · Vend Electric](https://ampmap.co.uk/charger/vend-electric-ids-swindon-uk) - Type 2 7 kW · Unit 9 Euro Way
- [Porsche Centre Swindon · Porsche Smart Mobility GmbH](https://ampmap.co.uk/charger/porsche-smart-mobility-gmbh-porsche-centre-swindon-uk) - CCS 350 kW · Frankland Road
- [National Self-Build and Renovation Centre](https://ampmap.co.uk/charger/national-self-build-and-renovation-centre-uk) - Type 2 7 kW · Lydiard Fields
- [Instavolt Lydiard Fields · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-instavolt-lydiard-fields-uk) - CCS 160 kW, CHAdeMO 60 kW · Lydiard Fields
- [IONITY GmbH IONITY Swindon VH](https://ampmap.co.uk/charger/ionity-gmbh-ionity-swindon-vh-uk) - CCS 200 kW, CCS 50 kW · Shaw Ridge Leisure Park, Whitehill Way · From 62.3p/kWh
- [Mannington Retail Park · Be.EV](https://ampmap.co.uk/charger/be-ev-mannington-retail-park-uk) - CCS 150 kW · SN5 8WA, Telford Way · From 59p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/rwe-npower-charging-station-npower-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 6 Mar 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
