RWE / Npower · EV charging site
Drummond Street Car Park
37 Drummond Street, Rotherham, S65 1HP
Drummond Street Car Park is an EV charging site in Rotherham, run by RWE / Npower. Both of its sockets are 22 kW Type 2, and charging is listed as free. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is McDonald's Rotherham (InstaVolt Ltd), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- RWE / Npower
- Opening hours
- Not published
- Access
- Public
- Price
- Free(from Open Charge Map, 9 Mar 2016)
- Getting there
- Max stay 2 hours
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Drummond Street Car Park (RWE / Npower)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Drummond Street Car Park (RWE / Npower)?
Up to 22 kW AC via Type 2.
How many charging sockets does Drummond Street Car Park (RWE / Npower) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Drummond Street Car Park?
Drummond Street Car Park is on the RWE / Npower network.
Where is the nearest charger with 50 kW or more to Drummond Street Car Park (RWE / Npower)?
McDonald's Rotherham (InstaVolt Ltd) is 0.6 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Drummond Street Car Park (RWE / Npower)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Drummond Street Car Park (RWE / Npower)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Drummond Street Car Park (RWE / Npower)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Extra - Rotherham
- McDonald's Rotherham
- BizSpace Bradmarsh Business Park
- Sycamore Road
- Pod Point Rotherham General Hospital - Public Carpark
- McDonald's, Aldwarke Lane
- Cheapest nearby
- Pod Point Rotherham General Hospital - Public Carpark · 39.6p per kWh · 7 kW · 1.4 mi
- Fastest nearby
- McDonald's Rotherham · 120 kW · 0.6 mi