# South Somerset District Council Offices · Scottish Power

Web page: https://ampmap.co.uk/charger/scottish-power-south-somerset-district-council-offices-uk

South Somerset District Council Offices is an EV charging site in Yeovil, Somerset, run by Scottish Power. Both of its sockets are 22 kW Type 2, and the price is listed as 35p/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Brympton Way, BA20 2HT
- **Area:** Yeovil, Somerset, United Kingdom
- **Coordinates (latitude, longitude):** 50.93550, -2.66682

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** 35p/kWh (from Open Charge Map)

## Site information

- **Operator:** Scottish Power
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** 1 dual EV Charging Stations (2 sockets Mennekes Type2) operated by Scottish Power. Contactless payment terminal fitted

## Common questions

### How much does it cost to charge at South Somerset District Council Offices (Scottish Power)?

The listed price is 35p/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at South Somerset District Council Offices (Scottish Power)?

Up to 22 kW AC via Type 2.

### How many charging sockets does South Somerset District Council Offices (Scottish Power) have?

2 charging sockets: 2 × 22 kW Type 2.

### Who operates South Somerset District Council Offices?

South Somerset District Council Offices is on the Scottish Power network. For site issues, the operator lists 0800 0015235.

### How long does a Tesla Model Y Long Range take to charge at South Somerset District Council Offices (Scottish Power)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at South Somerset District Council Offices (Scottish Power)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at South Somerset District Council Offices (Scottish Power)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Yeovil](https://ampmap.co.uk/chargers/united-kingdom/somerset/yeovil)
- [Cheapest charging in Yeovil](https://ampmap.co.uk/chargers/united-kingdom/somerset/yeovil/cheapest)
- [Scottish Power chargers](https://ampmap.co.uk/networks/scottish-power)

## Chargers near this site

- [Bell Inn (Yeovil) · evyve](https://ampmap.co.uk/charger/evyve-bell-inn-yeovil-uk) - CCS 75 kW · 207 Preston Rd · From 85p/kWh
- [Morrisons Yeovil · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-yeovil-uk) - CCS 50 kW, CHAdeMO 50 kW · Lysander Road
- [Fairfield Car Park SSDC · Scottish Power](https://ampmap.co.uk/charger/scottish-power-fairfield-car-park-ssdc-uk) - Type 2 22 kW · Salthouse Lane
- [Pod Point Tesco Extra - Yeovil](https://ampmap.co.uk/charger/pod-point-tesco-extra-yeovil-uk) - Type 2 7 kW · Queensway Huish · From 44.4p/kWh
- [Petters Way Car Park 1 · Scottish Power](https://ampmap.co.uk/charger/scottish-power-petters-way-car-park-1-uk) - Type 2 22 kW · Petters Way. Henford
- [Yeovil District Hospital · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-yeovil-district-hospital-uk) - Type 2 7 kW · Higher Kingston,

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/scottish-power-south-somerset-district-council-offices-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 5 Oct 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
