Shell Recharge · EV charging site
Shell Recharge Shell Brundall
Yarmouth Road, Norwich, NR13 5AR
Shell Recharge Shell Brundall is an EV charging site in Norwich, Norfolk, run by Shell Recharge and open 24 hours a day. Its 6 sockets reach up to 300 kW, with CCS at the top speed, and the published price is £0.80 per kWh. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Eon.Drive, 1.8 miles away.
Status
Not reporting
Checking status…
Connectors
CCS · 300 kW
CHAdeMO · 63 kW
Site information
- Operator
- Shell Recharge
- Opening hours
- Open 24 hours
- Payment
- In the Shell app
- Charger ID
- 01-1
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 300 kW | 80.4p per kWh |
| CHAdeMO | 63 kW | 80.4p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Shell Recharge Shell Brundall?
The listed price is £0.80/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Shell Recharge Shell Brundall?
Up to 300 kW DC via CHAdeMO, CCS.
How many charging sockets does Shell Recharge Shell Brundall have?
6 charging sockets: 2 × 63 kW CHAdeMO, 4 × 300 kW CCS. Live per-socket availability is shown on this page.
Is Shell Recharge Shell Brundall open 24/7?
Yes - Shell Recharge Shell Brundall is open 24 hours a day, 7 days a week.
Who operates Shell Recharge Shell Brundall?
Shell Recharge Shell Brundall is on the Shell Recharge network.
Where is the nearest other charger with 50 kW or more to Shell Recharge Shell Brundall?
Eon.Drive is 1.8 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Shell Recharge Shell Brundall?
A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Shell Recharge Shell Brundall?
A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Shell Recharge Shell Brundall?
A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£41 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Eon.Drive
- Norwich, UK - East
- Norwich Electric Forecourt
- Pod Point McDonald's - Norwich
- Bannatyne's Health Club - Norwich
- Acle Recreation Centre
- Cheapest nearby
- Pod Point McDonald's - Norwich · 27.6p per kWh · 7 kW · 1.8 mi
- Fastest nearby
- Norwich Electric Forecourt · 350 kW · 1.8 mi