Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Shell Recharge · EV charging site

Shell Recharge Shell Derby Road

100 Derby Road, Liverpool, Kirkdale, L20 1BP

Shell Recharge Shell Derby Road is an EV charging site in Kirkdale, Liverpool, run by Shell Recharge and open 24 hours a day. Its 10 sockets reach up to 150 kW, with CCS at the top speed, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 95% uptime and recorded 1208 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge Shell Waterloo, 2 miles away.

Status

8 of 10 available

Checking status…

VerifiedLive status and details from Shell Recharge’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS or CHAdeMO · 150 kW10 connectors · 89p per kWh8 free2 in use
01100% reliabilityAvailable
02100% reliabilityAvailable
03100% reliabilityCharging
04100% reliabilityAvailable
05100% reliabilityAvailable
06100% reliabilityAvailable
0754% reliabilityAvailable
08100% reliabilityCharging
09100% reliabilityAvailable
10100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Payment
In the Shell app
Charger ID
01

Facilities

Fuel stationShop

Always check directly with the charge point operator for the most up-to-date information.

Prices

89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 70 kW CHAdeMO~54 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Shell Recharge Shell Derby Road?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Shell Recharge Shell Derby Road?

Up to 150 kW DC via CCS, CHAdeMO.

How many charging sockets does Shell Recharge Shell Derby Road have?

10 charging sockets: 10 × 150 kW CCS, 10 × 70 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Shell Recharge Shell Derby Road open 24/7?

Yes - Shell Recharge Shell Derby Road is open 24 hours a day, 7 days a week.

When is Shell Recharge Shell Derby Road busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Shell Recharge Shell Derby Road?

Amp Map measured 95% uptime here from recorded live status over the last 30 days, across 1208 observed charging sessions.

Who operates Shell Recharge Shell Derby Road?

Shell Recharge Shell Derby Road is on the Shell Recharge network.

Where is the nearest other charger with 50 kW or more to Shell Recharge Shell Derby Road?

Shell Recharge Shell Waterloo is 2 miles away in a straight line, with up to 300 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Shell Recharge Shell Derby Road?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Shell Recharge Shell Derby Road?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Shell Recharge Shell Derby Road?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Shell Recharge · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.