Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Shell Recharge · EV charging site

Shell Recharge Shell Windsor

Clarence Rd 195, Windsor, SL4 5AE

Shell Recharge Shell Windsor is an EV charging site in Windsor, Royal Borough of Windsor and Maidenhead, run by Shell Recharge and open Mon–Sun 06:00–23:00. Its 8 sockets reach up to 175 kW, with CCS at the top speed, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 11 pm, and Amp Map measured 81% uptime and recorded 1905 charging sessions here over the last 30 days. 11 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Harvester Windsor Lad (BP Pulse), 0.5 miles away.

Status

5 of 8 available

Checking status…

VerifiedLive status and details from Shell Recharge’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 175 kW2 connectors · 89p per kWh1 free1 in use
01-2100% reliabilityBlocked
01-458% reliabilityAvailable
CCS · 150 kW4 connectors · 89p per kWh3 free1 out of service
02-1100% reliabilityAvailable
02-2100% reliabilityAvailable
03-130% reliabilityOut of order
03-2100% reliabilityAvailable
CHAdeMO · 70 kW2 connectors · 89p per kWh1 free1 in use
01-1100% reliabilityBlocked
01-359% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Mon–Sun 06:00–23:00
Payment
In the Shell app
Charger ID
01-1

Facilities

Fuel stationShop

Always check directly with the charge point operator for the most up-to-date information.

Prices

89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 175 kW CCS~24 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 175 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 175 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 175 kW CCS~21 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 175 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 175 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 70 kW CHAdeMO~54 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Shell Recharge Shell Windsor?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Shell Recharge Shell Windsor?

Up to 175 kW DC via CHAdeMO, CCS.

How many charging sockets does Shell Recharge Shell Windsor have?

8 charging sockets: 2 × 70 kW CHAdeMO, 2 × 175 kW CCS, 4 × 150 kW CCS. Live per-socket availability is shown on this page.

When is Shell Recharge Shell Windsor open?

Opening hours: Mon–Sun 06:00–23:00.

When is Shell Recharge Shell Windsor busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Shell Recharge Shell Windsor?

Amp Map measured 81% uptime here from recorded live status over the last 30 days, across 1905 observed charging sessions.

Who operates Shell Recharge Shell Windsor?

Shell Recharge Shell Windsor is on the Shell Recharge network.

Where is the nearest other charger with 50 kW or more to Shell Recharge Shell Windsor?

Harvester Windsor Lad (BP Pulse) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Shell Recharge Shell Windsor?

A typical 10–80% rapid charge takes about 24 min on the 175 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Shell Recharge Shell Windsor?

A typical 10–80% rapid charge takes about 23 min on the 175 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Shell Recharge Shell Windsor?

A typical 10–80% rapid charge takes about 39 min on the 175 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Shell Recharge · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.