# Shireoaks Village Hall

Web page: https://ampmap.co.uk/charger/shireoaks-village-hall-uk

Shireoaks Village Hall is an EV charging site in Worksop, Nottinghamshire, run by Shireoaks Village Hall and open 24 hours a day. All 3 of its sockets are 22 kW Type 2. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 100% uptime and recorded 4 charging sessions here over the last 30 days.

## Status

3 of 3 open at 22 Nov 2026, 22:24 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** St. Lukes Church Hall, S81 8LX
- **Area:** Worksop, Nottinghamshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.32122, -1.16923

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 3 | Not listed | 3 free |

## Site information

- **Operator:** Shireoaks Village Hall
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Shireoaks Village Hall?

Up to 22 kW AC via Type 2.

### How many charging sockets does Shireoaks Village Hall have?

3 charging sockets: 3 × 22 kW Type 2. Live per-socket availability is shown on this page.

### Is Shireoaks Village Hall open 24/7?

Yes - Shireoaks Village Hall is open 24 hours a day, 7 days a week.

### When is Shireoaks Village Hall busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 9 am. The live status on this page shows what is free before you set off.

### How reliable is Shireoaks Village Hall?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 4 observed charging sessions.

### Who operates Shireoaks Village Hall?

Shireoaks Village Hall is on the Shireoaks Village Hall network.

### How long does a Tesla Model Y Long Range take to charge at Shireoaks Village Hall?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Shireoaks Village Hall?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Shireoaks Village Hall?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Worksop](https://ampmap.co.uk/chargers/united-kingdom/nottinghamshire/worksop)

## Chargers near this site

- [Asda Worksop · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-asda-worksop-uk) - CCS 50 kW, CHAdeMO 50 kW · Highgrounds Way
- [Celtic Retail Park · POGO](https://ampmap.co.uk/charger/pogo-celtic-retail-park-uk) - CCS 200 kW · Celtic Retail Park · From 65p/kWh
- [Pod Point Tesco Superstore - Worksop Gateford Road](https://ampmap.co.uk/charger/pod-point-tesco-superstore-worksop-gateford-road-uk) - Type 2 7 kW · Gateford Road · From 44.4p/kWh
- [Worksop, Sandy Lane Retail Park · Source EV](https://ampmap.co.uk/charger/source-ev-uk-worksop-sandy-lane-retail-park-uk) - CCS 160 kW · Babbage Way · From 90p/kWh
- [Stoneacre Worksop-Nissan · Nissan UK Dealer Network](https://ampmap.co.uk/charger/nissan-uk-dealer-network-stoneacre-worksop-nissan-uk) - Type 2 7 kW · Turner Road
- [Newgate Street · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-newgate-street-uk) - Type 2 7 kW · Newgate Street · From 65p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/shireoaks-village-hall-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Shireoaks Village Hall (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
