Silverstone Green Energy · EV charging site
Bowling Green Lane Car Park, Knighton
Bowling Green Lane, Knighton, LD7 1DJ
Bowling Green Lane Car Park, Knighton is an EV charging site in Knighton, Sir Powys, run by Silverstone Green Energy. Both of its sockets are 22 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Ludlow Kitchen, Bromfield (Osprey Charging), 12.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Silverstone Green Energy
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Bowling Green Lane Car Park, Knighton (Silverstone Green Energy)?
Up to 22 kW AC via Type 2.
How many charging sockets does Bowling Green Lane Car Park, Knighton (Silverstone Green Energy) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Bowling Green Lane Car Park, Knighton?
Bowling Green Lane Car Park, Knighton is on the Silverstone Green Energy network.
Where is the nearest charger with 50 kW or more to Bowling Green Lane Car Park, Knighton (Silverstone Green Energy)?
Ludlow Kitchen, Bromfield (Osprey Charging) is 12.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bowling Green Lane Car Park, Knighton (Silverstone Green Energy)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bowling Green Lane Car Park, Knighton (Silverstone Green Energy)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bowling Green Lane Car Park, Knighton (Silverstone Green Energy)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.