Silverstone Green Energy · EV charging site
High Street Car Park
High Street, Blackwood, NP11 7JJ
High Street Car Park is an EV charging site in Blackwood, Caerphilly County Borough, run by Silverstone Green Energy. Both of its sockets are 22 kW Type 2. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Gallagher Retail Park (InstaVolt Ltd), 2.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Silverstone Green Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at High Street Car Park (Silverstone Green Energy)?
Up to 22 kW AC via Type 2.
How many charging sockets does High Street Car Park (Silverstone Green Energy) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates High Street Car Park?
High Street Car Park is on the Silverstone Green Energy network.
Where is the nearest charger with 50 kW or more to High Street Car Park (Silverstone Green Energy)?
Gallagher Retail Park (InstaVolt Ltd) is 2.7 miles away in a straight line, with up to 62 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at High Street Car Park (Silverstone Green Energy)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at High Street Car Park (Silverstone Green Energy)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at High Street Car Park (Silverstone Green Energy)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Commercial Buildings, Cwmfelinfach Car Park
- William Street, CWM
- Pod Point Ysbyty Ystrad Fawr
- Centre of Sporting Excellence, Ystrad Mynach
- Navigation Street Car Park
- Oakfield Street Car Park
- Cheapest nearby
- Pod Point Ysbyty Ystrad Fawr · 21.6p per kWh · 7 kW · 2.2 mi