Silverstone Green Energy · EV charging site
Mill Lane Workshop, Carew
Castle Lane, Jeffreyston, SA70 8SN
Mill Lane Workshop, Carew is an EV charging site in Jeffreyston, Pembrokeshire, run by Silverstone Green Energy. Both of its sockets are 22 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Superstore - Pembroke Dock, 4.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Silverstone Green Energy
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Mill Lane Workshop, Carew (Silverstone Green Energy)?
Up to 22 kW AC via Type 2.
How many charging sockets does Mill Lane Workshop, Carew (Silverstone Green Energy) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Mill Lane Workshop, Carew?
Mill Lane Workshop, Carew is on the Silverstone Green Energy network.
Where is the nearest charger with 50 kW or more to Mill Lane Workshop, Carew (Silverstone Green Energy)?
Pod Point Tesco Superstore - Pembroke Dock is 4.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Mill Lane Workshop, Carew (Silverstone Green Energy)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mill Lane Workshop, Carew (Silverstone Green Energy)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Mill Lane Workshop, Carew (Silverstone Green Energy)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Milton Depot, Milton
- Pod Point Lamphey Court Hotel
- Dial Cottage - Holiday Cottage
- Pod Point Apple Camping Ltd
- Pod Point Ivy Tower Holiday Village
- Pod Point Great Wedlock Farm and Deer Park - The Cinema Building
- Cheapest nearby
- Pod Point Apple Camping Ltd · 25.2p per kWh · 7 kW · 2.6 mi