Silverstone Green Energy · EV charging site
Oxford Road Car Park, Hay-on-Wye
Oxford Road, Hay, HR3 5EQ
Oxford Road Car Park, Hay-on-Wye is an EV charging site in Hay, Sir Powys, run by Silverstone Green Energy. Both of its sockets are 22 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Whitney Village Road (InstaVolt Ltd), 4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Silverstone Green Energy
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Oxford Road Car Park, Hay-on-Wye (Silverstone Green Energy)?
Up to 22 kW AC via Type 2.
How many charging sockets does Oxford Road Car Park, Hay-on-Wye (Silverstone Green Energy) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Oxford Road Car Park, Hay-on-Wye?
Oxford Road Car Park, Hay-on-Wye is on the Silverstone Green Energy network.
Where is the nearest charger with 50 kW or more to Oxford Road Car Park, Hay-on-Wye (Silverstone Green Energy)?
Whitney Village Road (InstaVolt Ltd) is 4 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Oxford Road Car Park, Hay-on-Wye (Silverstone Green Energy)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Oxford Road Car Park, Hay-on-Wye (Silverstone Green Energy)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Oxford Road Car Park, Hay-on-Wye (Silverstone Green Energy)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Whitney Village Road · 120 kW · 4 mi